# ACCESS-ESM1.6 scope and use for CMIP7 Fast Track

**URL:** https://forum.access-hive.org.au/t/access-esm1-6-scope-and-use-for-cmip7-fast-track/2093
**Category:** CMIP7 Models
**Created:** [9 May 2024 23:38 UTC](https://forum.access-hive.org.au/t/access-esm1-6-scope-and-use-for-cmip7-fast-track/2093 "2024-05-09T23:38:49Z")
**Posts on this page:** 1
**Showing post:** 15

<div class="post-metadata">

### Author: ![RachelLaw](https://avatars.discourse-cdn.com/v4/letter/r/da6949/32.png) [@RachelLaw](https://forum.access-hive.org.au/u/RachelLaw)
#### Post date: [31 May 2024 06:45 UTC](https://forum.access-hive.org.au/t/access-esm1-6-scope-and-use-for-cmip7-fast-track/2093/15 "2024-05-31T06:45:13Z")

</div>

Nitrogen flux units might want to be made more consistent. It seems as though N deposition is input/output as gN/m2/day while N fixing is input/output as gN/m2/y. The code accounts for this difference but it is more confusing than it needs to be. For CABLE standalone N deposition units appear to be gN/m2/y.

---

_[View the full topic](https://forum.access-hive.org.au/t/access-esm1-6-scope-and-use-for-cmip7-fast-track/2093)._
