# CSIRO - ACCESS-NRI standup minutes

**URL:** <https://forum.access-hive.org.au/t/csiro-access-nri-standup-minutes/3789>\
**Category:** CMIP7 development\
**Created:** [14 October 2024 04:20 UTC](https://forum.access-hive.org.au/t/csiro-access-nri-standup-minutes/3789 "2024-10-14T04:20:05Z")\
**Posts on this page:** 1\
**Showing post:** 82

<div class="post-metadata">

**Author:** ![anton](https://sea2.discourse-cdn.com/flex020/user_avatar/forum.access-hive.org.au/anton/32/1836_2.png) [@anton](https://forum.access-hive.org.au/u/anton)\
**Post date:** [16 March 2026 23:17 UTC](https://forum.access-hive.org.au/t/csiro-access-nri-standup-minutes/3789/82 "2026-03-16T23:17:44Z")

</div>

17 March 2026

Paul, Anton, Claire, Rachel, Romain, Martin, Joshua, Siobhan, Aidan, Spencer, Jhan, Lachlan, Pearse, Manodeep, Dougie, Dave Bi, Alex Norton

Rachel - needs instructions for perturbing atmosphere restart - (possibly [Ensemble run for ACCESS-CM2: Perturbations have no effect - #7 by jemmajeffree](https://forum.access-hive.org.au/t/ensemble-run-for-access-cm2-perturbations-have-no-effect/6038/7) )  
Jhan - CNP run at 520 years, CN only waiting for compute resource (next quarter)

**Large ensemble** for emissions driven scenarios / historical - Rachel

- needs an approach to generate and run the large ensemble starting from different restart files over time

- requires each ensemble member to have restart files changed (for wood carbon pools)

- need to document process for generating inputs

- could/should script the date change as well

- Possibly can use experiment generator to make configs - modify them with a script and then use experiment runner (example from scaling - [access-model-scaling/ACCESS-ESM1.6/dev-preindustrial+concentrations.ipynb at main · ACCESS-NRI/access-model-scaling · GitHub](https://github.com/ACCESS-NRI/access-model-scaling/blob/main/ACCESS-ESM1.6/dev-preindustrial+concentrations.ipynb) )

**CMIP7 Inputs**

- preparing forcings for these would be good
- Keen to start experiments with these soon (within a month)

**Registering for FastTrack**

- Rachel (& Romain) will register for ACCESS to provide results from FastTrack experiments

**Kyoto Meeting Update** - Tilo  
Christine will give update at ESM working group meeting  
Modelling centres seem to be in a similar position to us

Aidan - Some amounts of work needed to finalise filenames and metadata in outputs

---

_[View the full topic](https://forum.access-hive.org.au/t/csiro-access-nri-standup-minutes/3789)._
