# Overview of plans for CMIP7 data and evaluation from ACCESS-NRI and NCI

**URL:** <https://forum.access-hive.org.au/t/overview-of-plans-for-cmip7-data-and-evaluation-from-access-nri-and-nci/6934>\
**Category:** ESM/Land/CMIP7 Workshop Training and Hackathon\
**Created:** [27 August 2026 23:35 UTC](https://forum.access-hive.org.au/t/overview-of-plans-for-cmip7-data-and-evaluation-from-access-nri-and-nci/6934 "2026-08-27T23:35:22Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![NBateman-bit](https://sea2.discourse-cdn.com/flex020/user_avatar/forum.access-hive.org.au/nbateman-bit/32/45_2.png) [@NBateman-bit](https://forum.access-hive.org.au/u/NBateman-bit)\
**Post date:** [27 August 2026 23:35 UTC](https://forum.access-hive.org.au/t/overview-of-plans-for-cmip7-data-and-evaluation-from-access-nri-and-nci/6934/1 "2026-08-27T23:35:22Z")

</div>

Presenters: Kelsey Druken, Romain Beucher, and Christopher Bull (ACCESS-NRI)

**Brief presentations** :

- **CMIP7 data on NCI:** An ACCESS-NRI update (~10 min + Q&A/discussion)  
[CMIP7 data overview.pdf](https://forum.access-hive.org.au/uploads/short-url/3NfIcen8wejDD3fw62qDCAQAO4m.pdf) (880.2 KB)

- **Model evaluation, with a focus on CMIP (REF, ESMValTool, ILAMB):** Overview (~10 min + Q&A/discussion)  
[Model evaluation for CMIP - Romain Beucher.pdf](https://forum.access-hive.org.au/uploads/short-url/pQ8kZOK0W5zV0GVPUgP2sAffQz9.pdf) (782.6 KB)

- **Collaborative workflow for evaluation driven model development ​of CM3 and AM3:** Overview (~15 min + Q&A/discussion). [Christopher Bull presentation slides](https://forum.access-hive.org.au/uploads/short-url/oEykjj5alpDNUsft82iu7AIAEQo.pptx) (2.2 MB).

**Proposed plan for the rest of the day** :  
Split into groups:

- CMIP publications
- CM3
- AM3
- ESM1.6

_Note: This plan is flexible. Groups may move to another room at any time for discussions or work relevant to their group._
