ACCESS Land WG workshop day 2025 - notes

ACCESS Land Working Group Workshop Day

Friday Morning Session

Topic 1: Integration with PLUMBER2 Benchmarking Suite

(led by Gab Abramowitz)

Gab has been working to streamline modelevaluation.org and Benchcab integration. In summary:

  • Ability to drill down between multiple site / single site, and multiple variable / single variable analysis.
  • New Independent Normalised Metric Value approach: only benchmarks are normalized between 0–1 (models can be outside this range if better/worse than all benchmarks).
  • Automatic integration with OneFlux for flux QC processing/gap filling.
  • All code written by Gab in R, but contributors welcome.

Still needed for contributors:

  • Documentation
  • Minimal viable plotting template to build from

Plans (with afternoon discussion in bold):

  1. New analysis engines / modification of existing
  2. Automated feedback to CABLE developers
  3. Shared CABLE/JULES experiment and testing strategy
  4. Configurations for automated testing

Topic 2: Calibration / Evaluation / Data Assimilation Using Earth Observation

(led by Alex Norton)

Around the room: What observations are people using with CABLE?

  • Everything by default in iLAMB
  • IGBP
  • Flux tower data

Further discussion – how can we use observations better?

  • Many land products (e.g., iLAMB) are monthly → problematic for analysis.
  • Bureau has focused on diurnal performance.
  • Soil hydraulic properties not well observed.
  • Renato’s presentation showed many observationally derived products that can give insight into different processes.
  • Challenge: satellite-derived “observations” often rely on models (e.g., Latent Heat uses the same algorithm as LSM).
  • Vegetation height = low hanging fruit.
  • Siyuan integrated GRACE for JULES and subdaily LST.
  • Simulate SCIF then use as a constraint.

Plans (with afternoon discussion in bold):

  1. Review observational datasets for calibration/evaluation (beyond flux tower). Gather feedback.
  2. Data fusion studies (e.g., parameter optimisation).
  3. Non-categorical parameters/inputs.
  4. Identify additional outputs comparable with observations.
  5. Longer-term: generalisable parameter optimisation package (document existing work, limitations).

12-month plan: points 3, 4, 5, 6


Topic 3: Future Science Goals and Technical Challenges

(led by Ian Harman)

  • Ian showed a slide with various CABLE developments (some complete) not yet included in trunk.
  • Goal: rank projects by technical/scientific maturity, then prioritize.
  • Need cross-cell communication for BLAZE, Lateral Flow.
  • Cross-cell communication won’t be a problem (per Mikhail).
  • Sean: load balancing problem when parallelising on cells → might consider parallelising across tiles.

Plans (with afternoon discussion in bold):

  1. Create dependency graph of future science and technical challenges. Rank technical/scientific maturity.
  2. Identify technological impediments holding back science (e.g., categorical inputs, cross-tile communication).

Work Plan Revision

(led by Claire)

Remit of the Land WG:

  1. Collaborate on WG projects (systems development and model evaluation).
  2. Expand regular membership (e.g., through broad interest and invited seminars).
  3. Encourage interaction with other WGs.

Goals 1 and 2 may not align fully.

Proposed agenda:

  • Every second meeting:

    • Science seminar (internal or invited)
    • WG project update (remind, encourage involvement)
  • Longer interval (≈3 months):

    • Joint meeting with ESM / Atmosphere / Cryosphere WGs

Current projects:

  • MetForcing
  • Shared ancils
  • LSM comparison
  • BIOS/src

Discussion: Do we want Land cookbooks (like Cosima)?

  • Claire: Cosima started with model outputs, ancils, datasets. Script repository may become useful after that.

Friday Afternoon Session

PLUMBER2 / Benchcab

Q: What configurations are we going to test automatically?


Future Science and Technical Challenges

  • Dependency graph on whiteboard


Data Assimilation

  • Primary notes by Alex

WG Comparison Experiment

  • Circulate previous notes
  • Meeting with Siyuan needed to finalise metforcing/evaluation using:
    • Flux towers / benchcab
    • GRACE?
    • Runoff?
    • iLAMB?
    • Oz e FLUX?
    • ET?

Final Wrap-Up

Impediments for New Users to CABLE

  • Lack of documentation:

    • Standard setups
    • Build instructions
    • Run instructions
    • Parameter sequencing
  • From NRI’s perspective: documentation is a community responsibility.

  • No NRI-supported offline CABLE version → no official documentation.