Fast Track

Table of Fast Track experiments

Please add information if you are interested in running any of the Fast Track experiments with ACCESS-ESM1.6 or would be able to help with increasing ensemble size. For adding ensemble members, put these in as an extra line directly under where the experiment is currently listed in the table.
Timeline for production runs is ~September 2025 to mid-late 2026.
*indicates tentative

Experiment Institution Contact Resourced? Ensemble
DECK
piControl CSIRO @tiloz NESP 1
esm-piControl CSIRO @tiloz NESP 1
abrupt-4xCO2 CSIRO @tiloz NESP 1
1pctCO2 CSIRO @tiloz NESP 1
historical CSIRO @tiloz NESP 1
esm-historical CSIRO @tiloz NESP 1
amip CSIRO @tiloz NESP 1
piClim-control CSIRO @tiloz NESP 1
piClim-anthro CSIRO @tiloz NESP 1
piClim-4xCO2 CSIRO @tiloz NESP 1
C4MIP
esm-flat10 CSIRO @tiloz NESP 1
esm-flat10-cdr CSIRO @tiloz NESP 1
esm-flat10-zec CSIRO @tiloz NESP 1
1pctCO2-bgc CSIRO @tiloz - 1
1pctCO2-rad CSIRO @tiloz - 1
ScenarioMIP
scen7-hc
scen7-mc
scen7-mlc
scen7-lc
scen7-vlhoc
scen7-vlloc
esm-scen7-hc CSIRO @tiloz - 1
esm-scen7-hc UNSW @LaurieM * - 1
esm-scen7-mc CSIRO @tiloz - 1
esm-scen7-mlc CSIRO @tiloz - 1
esm-scen7-lc CSIRO @tiloz - 1
esm-scen7-vlhoc CSIRO @tiloz - 1
esm-scen7-vlhoc UNSW @LaurieM * - 1
esm-scen7-vlloc CSIRO @tiloz - 1
extensions
PMIP
abrupt-127k UNSW @LaurieM UNSW 1
AerChemMIP
No plans
DAMIP
hist-nat
hist-aer
hist-GHG
LMIP
land-hist CSIRO? -
GEOMIP
G7-1.5K-SAI
CFMIP
amip-p4k
amip-piForcing
abrupt-2xCO2
abrupt=0p5CO2
RFMIP
piClim-histaer
piClim-aer
piClim-histall
DCPP
No plans
1 Like