CSIRO - ACCESS-NRI standup minutes

Meeting Notes 28/10/2025

Participants: @cbull @anton @MartinDix @sofarrell @clairecarouge @pearseb @Jhan @Aidan @alexnorton @lachlanswhyborn @manodeep @paulleopardi @rbeucher @tiloz @RachelLaw

Chair: @clairecarouge

Minutes: @cbull

control run candidates update

“October B” is the current lead candidate but a decision still hasn’t been made.

Pearse: Colder at depth and warmer in the upper cell. This is similar to what biases we had in esm1.5 and had implications for the carbon cycle. 0.2 petagrams per carbon, currently trending downwards.

Tilo: Beginning of November we want to be transitioning to the control run.

Pearse: will run some sensitivity tests.

Pearse: how much compute do we have this quarter?

Tilo: we have ~7 MSU available and we’re currently tracking to use those but we will reduce down to 1 run once we have chosen a candidate (there will eventually be some spin off runs).

Forcing preparation

For the control runs, we still need the forcings. We’re waiting on the historical forcing but have the preindustrial.

Davide has been looking at the nitrogen forcing (whilst Paul was away), Paul needs to check in to where he got to

Paul has been looking at the ozone forcing, yet to come up with a proper spec for it. Having a chat to Martin about it.

Cable library update

Lachlan: almost ready to come in. Still waiting on a few spack tweaks (UM / Gcom). UM7 is failing CI. Paul: thought everything was supposed to be built with intel but is it an issue? Aidan/Anton thought this might be a pre-existing issue and can likely be bypassed. Manodeep sugested sharing the actual error just in case it’s highlighting a coding problem.

Misc